Day 11 (November 8, 2008)

Panels between rear fenders and the rear deck were fabricated and welded into place. 3 hours

Day 12 (November 11, 2008)

Trunk lid was fabricated. 5 hours

Day 13 (November 14, 2008)

Pieces for roof and left drip rail were cut, welded, and primed. 1 hour

Day 14 (November 15, 2008)

1930 Chevy frame was moved to lower barn and stripped. 4 hours

Day 15 (November 16, 2008)

1946 Ford axle was moved down to lower barn. Spring was cut off and the wishbone was split. Car was mocked up. 4 hours

Make a Free Website with Yola.