Day 16 (November 17, 2008)

Right drip rail was welded on. 1 hour

Day 17 (November 18, 2008)

Fabrication of frame began. 2 3/4 hours

Day 18 (November 19, 2008)

2" by 3" box tube for main rails were cut and cleaned. Crossmember was welded. 2 hours

Day 19 (November 22, 2008)

1930 Chevy frame was cut. Rear section was sand blasted. 3 hours (51)

Day 20 (November 23, 2008)

Rear rails were boxed and new frame section was welded. 3 hours