Day 81 (June 22, 2009) 

Welded the removable cross member. Installed dummy engine and trans. Welded the fixed trans cross member into the frame. Welded the bottom of the two rear cage outriggers. 1 1/2 hours (250)

Day 82 (July 3, 2009)

Stripped dryer in order to use panels for flooring. Made floor panel over trans. 4 hours

Day 83 (July 4, 2009)

Welded ladder bar brackets to cross member. Cleaned up roll cage tubing. Installed drive shaft tunnel/seat/seatbelt support tubing. Fabricated trans tunnel. Calvin fabricated floor panel between frame and sill. Pulled housing from Plymouth and axles from Henry. 6 hours

Day 84 (July 6, 2009)

Welded in 3 floor panel pieces. Made 2 pieces at frame/fender area. Did metal work at parachute mount. 5 hours

Day 85 (July 7, 2009)

Paula took car to Jason's with Dave's trailer. 1 1/2 hours