Day 26 (November 29, 2008)

Krietz Flea Market. Halo bar and front left upright were welded into place. Front right upright was cut and primed. 2 1/2 hours

Day 27 (November 30, 2008)

Twelve pieces were fabricated. Front right upright was welded into place. Body was lifted up. Welds were finished on both uprights and painted. Box tube frame ends were welded. Body was lowered back down. Cage was welded to frame. Body was welded to cage and frame. 4 hours (82 1/2)

Day 28 (December 1, 2008) 

Rear struts were cut and tacked in place. 2 hours

Day 29 (December 2, 2008) 

Rear struts were welded and parachute mount fabrication began. 2 1/2 hours

Day 30 (December 6, 2008) 

Rear section of frame and parachute mount was worked on. Traded pieces of 2" by 4" and 2" by 3" box tube for 2 pieces of 2" by 3". 6 hours