Day 31 (December 7, 2008) 

Front frame rails were worked on. Cut 1" and made 3" by 5" taper. 2 hours

Day 32 (December 8, 2008) 

Front frame kick up was worked on. 2 hours (97)

Day 33 (December 11, 2008) 

Front frame rails were worked on. 2 hours

Day 34 (December 13, 2008) 

Front rail section was mounted. Three roll bar pieces were installed in the cage - dash bar and front struts to top of frame kick up. 5 hours

Day 35 (December 21, 2008) 

Front frame horns and the 2 cowl extensions, made from the hood inner structure, were sand blasted. Modified the cowl/firewall area on the left side. 1 1/2 hours